11 November 2026 · Bearsource
More first orders go wrong at the payment step than at the production step. The product gets all the attention — samples, specs, inspections. Then the money moves, based on bank details that arrived in an email, to a company the buyer has never verified, on a schedule nobody wrote down.
This guide covers how factory payments normally work, how to structure them so every payment buys you something real, and the scams that sit in between the two.
For consumer goods made in Asia, the standard structure is a telegraphic transfer (T/T) in two parts: a deposit, then a balance. The most common split is 30/70:
Variations are normal and not, by themselves, red flags:
One more variation worth knowing: where materials dominate the cost — metal goods, or electronics built around expensive components — a deposit of 40–50% can be legitimate, because your deposit really is buying materials before a single unit exists. The question to ask is what the deposit buys. A factory that can show material orders and invoices against your deposit is telling a consistent story. One that simply wants a bigger number is not.
Also agree the small print early: the currency (USD is most common), and who carries the bank charges. A payment that arrives $45 short because fees were taken in the middle has started more arguments than it ever needed to.
The principle is one sentence: money moves when the product moves. Each payment should unlock a specific, verifiable step:
Write the inspection condition into the PI before the deposit, not after a problem appears. If the inspection fails, the balance waits while the factory reworks and you re-inspect. This is the single strongest lever a buyer has, and it costs nothing — it only works if it was agreed at the start.
And a hard rule: never pay a balance against photos alone on a first order. Production photos can be old, borrowed, or of somebody else's goods.
The personal account. "Pay our boss's account, it's faster." No. A legitimate factory invoices and receives payment as a company. Paying a person breaks your paper trail, your customs and tax records, and usually means the money is outside any contract you signed. This is the brightest red flag there is.
"Our bank details have changed." The most expensive scam in importing. A mailbox gets hacked — yours or the factory's — or an address gets spoofed, and just before the balance falls due, a polite email arrives with new bank details. The money lands in a fraudster's account and is gone within hours. It targets the balance payment on purpose: the relationship feels proven by then, and everyone is in a hurry to ship.
The mismatched beneficiary. The contract says Factory A. The invoice says Trading Company B, with a bank account in a third country. Sometimes there is a legitimate structure behind it — an export agent, a Hong Kong entity. But if you cannot explain exactly who you are paying and why, stop until you can.
Pressure and timing games. "Pay today or you lose your production slot." Sometimes urgency is real — before Chinese New Year, slots genuinely disappear. Often it is manufactured to stop you verifying anything. Real deadlines survive a one-day pause for a phone call.
The ghost supplier. A price 30% under every other quote, a big deposit demand, and a company registered last year with a beautiful website. Cheap quotes are the bait; the deposit is the product.
Mold money deserves its own rule. Pay in stages — commonly 50% to start tooling and 50% after you approve samples made from the finished tool — and never 100% before samples exist. The contract should say the mold is your property, marked with your name, and never used to produce for anyone else. Ask for photos of the marking. Factories that build tools professionally expect all of this.
Paying a factory safely is not about trusting or distrusting anyone. It's about structure: the right beneficiary, payments staged against verified events, and documents in order before money moves. Set that up once and the normal 30/70 world works the way it should — thousands of brands run it every week without drama.
This is how we run payments on the projects we manage. As a production-management partner, we set the payment schedule in the contract, check the beneficiary against the factory's licence, and release the balance only after inspection passes. You always know what the next payment buys. Start a Project and we'll build your order the same way — from idea to shipment.